ANOTHER SUCCESSFUL STAGE BUILD, THIS TIME FOR THE 2016 MTN 8 FINAL
After weeks of planning and designing from a structural engineer's and artist's point of view, the Figure 8 'Stage' was set for the MTN 8 Final which took place at Mbombela Stadium in Nelspruit.
Tungsten were commissioned to build a Figure 8 Stage for the trophy hand-over and post-match presentations that needed to be carried onto the field and set up in under 15 minutes. A second stage was built in the stands to accommodate live performances including Mi Casa who entertained the crowd during the half-time break.